Nissan Patrol Y61 GU ZD30 CRD - (2004 - 2015) - Common Rail - Intake with 3" Highflow Turbo Inlet to Modify Standard Airbox

Regular Price
$600.00
Sale Price
$600.00
Regular Price
Sold Out
Unit Price
Translation missing: en.general.accessibility.unit_price_separator 
Tax included. Shipping calculated at checkout.

Powder Coat Colour Polished

SKU

STAINLESS STEEL - WITH 3" HIGHFLOW TURBO INLET

(made to order)


- Intake Pipe is 3"

- Maff Housing (Rectangle)

- Includes 3" Elbow for Airbox lid

- Includes 3" Highflow Turbo Inlet*

- Includes all mounting hardware

- Requires Factory airbox lid to be modified to suit our elbow

- Set postage shown at checkout for Australian Residents

  

Finish: Polished or Powder Coated*

*Powder Coating - additional +$60

To view our powder coat colour options: Colour Gallery – Fabwitz Industries

    

*3" Highflow Turbo Inlet cannot be polished as it is cast metal. If polish finish is chosen the inlet will be as is in Cast metal as per photos.

  

Please note: this is to suit the GU ZD30 CRD (Common Rail) 2004-2015 models. If you are unsure, please contact us directly

  

Please note: our airbox can be purchased later down the track if you wish to have a complete kit

STAINLESS STEEL - WITH 3" HIGHFLOW TURBO INLET

(made to order)


- Intake Pipe is 3"

- Maff Housing (Rectangle)

- Includes 3" Elbow for Airbox lid

- Includes 3" Highflow Turbo Inlet*

- Includes all mounting hardware

- Requires Factory airbox lid to be modified to suit our elbow

- Set postage shown at checkout for Australian Residents

  

Finish: Polished or Powder Coated*

*Powder Coating - additional +$60

To view our powder coat colour options: Colour Gallery – Fabwitz Industries

    

*3" Highflow Turbo Inlet cannot be polished as it is cast metal. If polish finish is chosen the inlet will be as is in Cast metal as per photos.

  

Please note: this is to suit the GU ZD30 CRD (Common Rail) 2004-2015 models. If you are unsure, please contact us directly

  

Please note: our airbox can be purchased later down the track if you wish to have a complete kit

General lead times range from as little as 1 week, up to 6 weeks. This is dependent on the individual product itself. Please refer to our "Shipping/Collection" information.

All products are hand crafted and made to order.
We use 316 graded stainless steel across a wide range of our products. Excluding selected products, please refer to each item description for further details.

Please refer to our "Returns & Refunds" Policy regarding Change of Mind.